Concrete Foundations in Edmonton

Looking for a team with a record of delivering dependable concrete foundations? Grey Lion Construction Corp. has the experience and precision needed to complete complex concrete work with absolute reliability.

We approach every structure with proven methods, advanced formwork, and a commitment to quality that stands up to the toughest project requirements. From medical centers with parking garages to commercial developments and multi-storey facilities, we get the job done right.

Call (587) 557-1416 to connect and get your Edmonton property started!

Build Your Concrete Foundation

What Type of Concrete Foundation Do You Need?

The foundation for a basement won't be the same as one for an airport with heavy-load requirements. Different structures call for different systems, from shallow footings to complex cast-in-place walls, each designed to meet specific structural demands, soil conditions, and load requirements.

Our team assesses your project's needs by considering factors like building use, site grading, and subgrade conditions. Whether a suspended slab is required for an underground parking facility or a deep foundation is needed for a multi-storey building, we match the right system to the job.

Will You Need Foundation Reinforcement?

Your concrete foundation may not need reinforcement, but it's often required when the structure needs to support heavy loads, span long distances, or handle shifting soil conditions.

If your project calls for reinforcement, we can integrate rebar, wire mesh, or post-tensioned cables into the foundation design. These systems work by distributing stresses across the slab or walls, giving the finished structure the added strength and flexibility it needs to perform over its lifetime.

How Do You Determine the Right Concrete Foundation Depth?

Concrete foundation depth can vary significantly depending on the structure's demands. A small building with light loads won't require the same depth as a commercial facility designed to support heavy equipment, multiple floors, or continuous traffic. It's important that the depth be precise. If it were too shallow, for instance, it would fail to distribute the load properly, leading to cracking.

We determine the right depth by evaluating soil strength, expected load, and building design. A distribution center with heavy racking systems, for example, may require deeper foundations to handle concentrated loads and prevent settlement. A much shallower depth might be needed, on the other hand, for a single-storey commercial space where weight and ground pressure are significantly lower.

Grey Lion Construction Corp.'s Concrete Foundation Services

Trusted by Edmonton International Airport, Ross Creek Medical Centre, CFB Edmonton, and many more, we can bring the same proven foundation expertise to your project.

Our foundation work follows a clear, proven process:

  • Detailed layout and foundation marking before excavation
  • Proper formwork installation checked against structural drawings
  • Reinforcement placed and inspected before concrete is poured
  • Continuous supervision during concrete placement and finishing
  • Regular site checks to confirm structural specifications are met
  • Final inspection of forms, slabs, and walls before turnover

What To Expect When Working With a Foundation Contractor

Every project moves through different stages, and knowing what to expect from us as your foundation contractor helps you stay informed and prepared throughout.

Our process begins with a detailed review of your plans and project requirements. We need to establish the right foundation strategy early, so construction stays on track and every critical detail is addressed before work begins.

Working with us, you can expect:

  • Clear updates at each major project stage
  • Professional coordination with other trades as needed
  • High standards for safety and site management
  • Solutions for awkward or unexpected site conditions
  • Consistently high-quality work from start to finish

How Long Does It Take To Lay a Concrete Foundation?

Concrete foundation projects can vary widely in scope, which makes it difficult to offer a meaningful timeline without understanding the demands of your build. Smaller foundations may be completed quickly, while larger or more technically complex structures require extended scheduling.

The timeline depends on the size of the structure, the type of foundation, site conditions, and the complexity of the forming and reinforcing work. Projects with specialized requirements, like curved walls, mass pours, or post-tensioned systems, will naturally take longer due to what they require.

How Long Does a Concrete Slab Take To Cure?

Curing is the process where concrete retains moisture long enough for the chemical reaction between water and cement to fully develop the slab's strength. If the slab dries too quickly or unevenly, it can weaken internally, causing surface cracks and long-term durability issues.

Curing time isn't the same for every project. It depends on the type of concrete, the thickness of the slab, the weather, and the conditions at the site. Some slabs can support light use within a few days, but full curing often takes several weeks to reach maximum strength.

Due to this variation, we have to explain when the slab can be used safely and how long it will take to reach full strength once the work is complete. We can also go over usage, access, or any site restrictions, and you can ask any questions you have about the next stages of construction at that time.

Will Your Commercial Foundation Need To Be Completed in Phases?

Some commercial foundation projects need to be completed in phases to match the complexity of the structure or the demands of the site. When necessary, phasing allows work to move forward safely and efficiently, especially when different parts of the foundation have different technical requirements or construction timelines.

A multi-level structure with suspended slabs and integrated drop pans, for example, often needs phased work so each level can be formed, poured, and cured before the next stage is built above it.

Phasing is often required for foundations when:

  • The project involves multiple structural systems tied into one foundation.
  • Access to different parts of the site must be staged around other construction work.
  • Specialized forming systems need to be reconfigured between sections.
  • Heavy equipment or cranes must be relocated during construction.
  • Foundations must be tied into existing structures without disrupting operations.

Secure a Strong Base With Professional Concrete Work

Get your project off the ground with trusted concrete work from Grey Lion Construction Corp.. A strong foundation today builds the success of everything that comes next for your project.

Need concrete foundations in Edmonton? Contact us at (587) 557-1416.